Refer to important notes for more information on water resistive barriers.
How to start vyinl siding.
Starting with the soffit nail.
Remove any siding or exterior finish that isn t compatible with vinyl siding and make sure the walls are sheathed with a substrate to receive the siding.
Consult your local.
Install flashing before starting to apply the siding.
We cover how to move doors and windows and create a weather proof exterior.
All vinyl siding and vinyl soffit and fascia can be cut with tin snips a circular saw with a plywood blade or by scoring it with a knife and breaking it.
A flat level wall surface is necessary for proper installation of vinyl siding.
If you don t cut your siding short when it expands in the summer it s going to buckle.
This is where the new siding will begin.
Utility knife score panel with knife then bend the vinyl back and forth until it snaps cleanly on the scored line.
When installing vinyl siding on each side of a window or door start on the side that needs the longer panels.
When cutting vinyl siding it s usually to go into a corner.
Vinyl siding starter strips.
This chalk line should be level and a consistent distance from the eaves or the top and bottom of the windows.
Whatever your measurement is take at least 1 4 or 1 8 on both sides for the panel to slide back and forth.
Aviation tin snip start cutting at the top interlock and continue toward the bottom of the panel.
You need to leave at least 1 4.
Longer siding panels don t stretch as readily as smaller ones so they re not as easy to adjust if they get out of whack.
Unless already installed a water resistive barrier should be applied to the house prior to installing vinyl siding.
Not just another vinyl siding installation video.
Siding panels should be nailed 12 in.
Power saw bench or radial arm saw.