Step 3 position the weather stripping and trim above the garage.
Installing garage door trim.
Use an angle gauge to.
Lower a double door by recruiting at least two helpers to help with the weight and place a 2 4 block under the door to prevent smashing a foot or finger when it s lowered.
Measure the inside dimensions of the garage door jamb horizontally across the top and vertically along both sides.
How to trim a garage door opening 1.
Learn how to install our vinyl thermostop garage door trim.
Usually the trim is made in wood however it is now available in vinyl as well.
Lower the door and dismantle it by removing the hardware.
Use a hack saw to cut the trim to the length you need.
Remove the sections one at a time by disconnecting the rollers and brackets.
Fasten every 12 to 16 in.
You will need to measure both the height and the width of the garage door.
Before after installation vinyl garage door trim remove the old jamb and trim then nail the vinyl jamb to the frame beginning with the top piece.
Collated finishing nails step 1.
Make the cuts step 5.
Use 6d casing nails for the stop molding nailing it at the premarked points on the trim.
Calculate the head length step 4.
Vinyl garage door trim acts as a cachet between the garage door jamb and the garage door.
Calculate the side length step 3.
Vinyl trim is used the most nowadays and the reason for this is the easy installation of vinyl trims as well as the variety of colors available.
Prepare to install door trim step 2.
Measure for the brick molding the trim that will face the street starting with the top piece.
Precut the miters on the top piece of brick mold trim and nail it to the framing every 12 in.