I prefer a hatchet but in some.
Installing standing seam metal roofing details.
Install additional sections of hip ridge flashings with minimum 4 inch end laps and tube sealant at laps.
Double lock seam symmetrical seam one piece snap lock interlock and two piece snap lock interlock.
For do it yourself enthusiasts for your first installation we recommend installing standing seam on a simple gable roof with minimum roof penetrations.
Installation of a standing seam metal roof involves joining vertical interlocking panels from the top of the roof ridge to the roof s eave edge.
Basic preparation for the job the most important thing about installing standing seam is to measure the roof.
Fasten with appropriate substrate fastener at minimum 4 fasteners per zee or 3 inches on center.
Metal roofing it s a general term that covers a broad scope of roofing options products and choices.
The area where each panel joins the next is raised above the roof s flat surface.
Some manufacturers have roofing systems that require a minimum of 3 12 roof slope for standing seam installations.
Enjoy the videos and music you love upload original content and share it all with friends family and the world on youtube.
Rivet hip ridge flashing to top flange of zees at 18 inches on center both sides.
Apply a row of tube sealant along back face of zee closure adjacent to panel legs.
In general the greater the slope of the roof the better as standing seam is a water shedding system and relies to slope and gravity to shed away any rainwater moisture and snow.
When someone references metal roofing he or she could be talking about shingles or tiles made of metal an exposed fastener roofing system that is common for agriculture buildings or maybe even a standing seam metal roofing system.
Necessary tools materials and supplies a roofing hatchet or a carpenter s hammer.
There are four basic standing seam metal roof panel styles.
Pancake screws are applied to the nail strip of the standing seam panels.
The lower end of each panel is then trimmed and the hem pre bent before installation see pg 9.
When used extended drip edge should be installed first along the drip edge of the roof.
Use hip ridge flashing to locate correct position of zee closures.
Install zee closures onto panels at both sides.
Mbci manufactures quality standing seam metal roofing panels that are lightweight and last up to 60 years.