Before any work is done a representative works with you to determine your specific needs and the best way to install the surround.
Installing tub wall over tile.
Above the lip of the tub.
Over tile some bathtub wall kits are designed to be put directly over ceramic wall tiles according to jennifer renglich marketing director for bath fitter a national chain for bathroom remodeling products.
And it lasts for 20 years.
Typically screws secure each of these items in.
Apply strong adhesive to the tile and the wall.
Then rinse the wall with a water dampened.
Start installing the.
Then apply a generous amount of thin set to the bottom bathtub tile and position it 1 8 in.
Apply it to the wall with the bottom edge about 1 4 in.
How to install a shower surround over existing tiles step 1.
Remove the faucet handle face plate spout and shower head.
The best approach when installing cement board or other tile backer around a tub is to keep the cement board out of the lip area.
To tile around a tub or shower start by measuring the height of the back wall from the lip of.
The old tile area needs to be smaller than the kit and you ll need to build up the surrounding wall.
Mark the layout lines.
Tub surrounds can sometimes be installed over existing tile but only when conditions are right.
Scratch the tile with sandpaper to rough up the surface.
Fill the gap between the tile and the tub with caulk.
Learn the largest tile industry secret to remodel your bathroom for just 200 bucks and 1 days work.
How to tile a tub surround 1.
Leave at least 1 4 inch edge around the installation area.
Mix degreasing cleaner with water in a bucket using a dilution recommended by the cleaner manufacturer.
This gives the tub surround sealant a stronger hold.
Scrub the wall tiles with diluted degreasing cleaner and a nylon scrub brush.
Once the surround shower is assembled you can install it.
For this step follow the instructions that came with your specific surround.
Once the adhesive is in place install the shower surround.
Layer newspaper on the floor across the bottom of the tiled wall.
Start at the intersection of the two layout lines and spread a thick layer of tile mastic.